Photovoltaic revamping: REPOWER chooses MRP
MRP assisted Repower Renewable (Repower Group) as technical advisor in the photovoltaic revamping and repowering of 13 PV systems in Italy for a total power of over 23 MWp. The contract assignment is divided into 3 distinct phases, which involved the various MRP teams: Phase 1: assets evaluation Phase 2:
Photovoltaic cleaning: choose the specialists (the careful ones)
Sooner or later all the people in the industry come up with the fateful question: “Do I have to clean the modules? Is the photovoltaic cleaning so important?” Simplifying the answer and leaving aside the most disparate theories on water quality and temperature, technology, type, brush material
How is your PV plant? Chose MRP for your check-up
Do you know what the installer of your photovoltaic system and your handyman electrician have in common? Both of them turn to MRP if your system does not work as it should (provided they tell you that something went wrong…)! This is because the MRP team is made up of experts in the manufacturing of
1.5 MWp plant analyzed with electroluminescence
The 100% of the utility-scale plant was analyzed using EL tecnique In the last few days, MRP engineers have completed the electroluminescence inspection on a PV power plant with more than 1500 kWp power. The plant, located in northern Italy and installed on a roof, was made up of over 6500 modules that w